Home 1

pipeline installation

client:fastflow group

brief

Fastflow was constructing a major new 900-millimetre steel pipeline, which transports North Sea gas all over the UK.

I was briefed to photograph the ongoing construction work. It was part of a large project documenting the work of Fastflow all over the UK between the North of England and the Isle of Wight.

Andrew Heptinstall FASTFLOW
Andrew Heptinstall FASTFLOW

execution

As an ongoing project, I wanted to bring a sense of constant work and movement to the images. I worked closely with the client to be on site for the best timings of action at all locations.

Working with real-life situations and non-models, I could react quickly to moments of activity.

Health and safety procedures were carefully planned and adhered to while on site.

outcome

A range of imagery was produced to be used in PR, publications and on websites.

Andrew Heptinstall FASTFLOW

brief

Fastflow was constructing a major new 900-millimetre steel pipeline, which transports North Sea gas all over the UK.

I was briefed to photograph the ongoing construction work. It was part of a large project documenting the work of Fastflow all over the UK between the North of England and the Isle of Wight.

Andrew Heptinstall FASTFLOW

execution

As an ongoing project, I wanted to bring a sense of constant work and movement to the images. I worked closely with the client to be on site for the best timings of action at all locations.

Working with real-life situations and non-models, I could react quickly to moments of activity.

Health and safety procedures were carefully planned and adhered to while on site.

Andrew Heptinstall FASTFLOW

outcome

A range of imagery was produced to be used in PR, publications and on websites.

Andrew Heptinstall FASTFLOW

feedback

“Andrew is extremely professional and thorough, ensuring we get exactly what is required by the brief and more.”

Paul Dobbie  Managing Director -Persuasion Public Relations